Post-Construction: Small holes will be drilled along the perimeter of the premise and the chemical solution will be pumped into the holes in order to form a chemical protection layer against the termites after a thorough inspection of the building to identify any areas susceptible to termite infestation. This includes areas where wood comes into contacts with the ground, such as foundation walls, support piers, and utility entrances.